April2016

April 2016

ZS30 INSTALLATION
Another Cooper Freer project left the workshop this month with two ZS30 oil free blower units heading to our clients water treatment site. These units were delivered, installed with the required pipe work and commissioned by the Cooper Freer team. For more information on the ZS oil free air range please do not hesitate to contact us